Road 022105 in UT -- Camping Rules & Access
Road 022105 in UT
Road corridorBLM, Vernal
15 mi from Naples
Maps 5,411 ft
Camping permission not confirmed
A stay limit is confirmed. It does not establish permission to camp here.
Stay limit: 14 days
VerizonNONE
AT&TUSABLE
T-MobileUSABLE
StarlinkEXCELLENT
Road Access
Rough
- Road difficulty 3 of 5: a rough drive in.
- By its Census road type this is maintained for passenger cars, but the condition is unverified.
- Recorded as pitching to 26%, 100% of it on a shelf.
- Estimated climb: 1,200 ft, with sustained grades near 22% and pitches to 26%.
- Terrain estimates show roadside drops of up to ~120 ft on the downhill side.
- Dead-end road; turnaround space is not mapped.
Setting
Secluded
- Secluded here, with the nearest through road 2.4 miles off.
- Cliff Ridge stands 2,815 ft above the map pin, 4.5 miles east.
Rules
Climate averages
October normals 34–64°F, 1.1″ precipitation. Monthly averages, PRISM 1991–2020.