Co Rd 25 in CO -- Camping Rules & Access
Co Rd 25 in CO
Road corridorBLM, Gunnison
10 mi from Ouray
Maps 11,520 ft
Camping permission not confirmed
A stay limit is confirmed. It does not establish permission to camp here.
Stay limit: 14 days · within 30 days · then move 30 mi
VerizonNONE
AT&TNONE
T-MobileNONE
StarlinkGOOD
Road Access
Rough
- Road difficulty 3 of 5: a rough drive in.
- Near Sunnyside Mill Ruins Viewpoint.
- By its Census road type this is maintained for passenger cars, but the condition is unverified.
- Recorded as pitching to 18%, 100% of it on a shelf.
- Estimated climb: 0 ft, with sustained grades near 18% and pitches to 19%.
- Terrain estimates show roadside drops of up to ~140 ft on the downhill side.
- Terrain estimates suggest little level ground beside this road.
Setting
Fairly secluded
- Well separated here, with the nearest through road 1.1 miles off.
- Hanson Peak stands 1,917 ft above the map pin, 1.1 miles northwest.
Rules
Climate averages
October normals 25–48°F, 3.9″ precipitation. Monthly averages, PRISM 1991–2020.